Channel Standards Draft 0.3, not yet adopted

Submission Guide

How a Reticular channel is briefed, handed in and judged. Part of the Channel Standards, draft 0.3.

The path

  1. Brief, one page: the idea in a sentence, the dataset and its licence, the feeling, what changes when the data changes, what “normal” is, and the rhythm in numbers (N and M, Data Standards §4).
  2. Licence first. We check the data’s licence before any design work.
  3. Sketch on the TV, early. the CEO sees a rough version on the real Bravia before it is finished, not only at the end.
  4. Build to the Art, Data and Technical Standards for its tier.
  5. Self-check with the studio checker and the sandbox harness.
  6. Hand it in: a draft pull request and a note to the Reticular team.
  7. Our checks (T0 to T6): the card, the static check, a read of the code, the sandbox, the glass, the TV, and QA. Pass or returned, with exact fixes.
  8. the CEO’s walk on the TV: the eight tests, ending with “would I leave it on?” GO or NO-GO.
  9. Approved: we install the exact bytes reviewed. Going live is the CEO’s call, every time.

What a producer gets back

A verdict in a fixed form at every step, readable by a person and by an agent: what passed, what to fix, and what passing looks like.

Draft 0.3, 23 October 2026.